Case studies

Learn more about how SafeLane Global can support your operations, training or consultancy requirements by delving into their constantly updated library of case studies.

If you don’t find what you’re looking for, contact SafeLane Global for a full discussion of your needs. Your call will be prioritised, and you’ll speak to the best-qualified individual to support you.

SafeLane Global has an unrivalled depth and breadth of skills, exposure to a wide range of end environments and ability to deploy rapidly in-country and internationally.

Target investigation and excavation Enfield, UK

Following an intrusive survey on a development site in Enfield, SafeLane Global recommended excavation of an anomaly presenting as potential unexploded ordnance.

Read more

Pre-drill surveys Deptford Wharves UK

Pre-drill surveys and full site clearance for a multinational construction infrastructure company.

Read more

Emergency UXO incident handling UK

A German airdropped SC250kg bomb was discovered on a construction site in Bath. SafeLane Global subject matter experts successfully handled the incident.

Read more

High resolution magnetometry survey UK

SafeLane Global conducted a high resolution magnetometry survey to identity potential items of ordnance at a former RAF base in Gloucestershire.

Read more

Woolwich Arsenal UXO risk assessment

SafeLane Global undertook a comprehensive stage 2 risk assessment on the site of the former Woolwich Arsenal.

Read more

UXO disposal for construction company in Scotland

SafeLane Global was employed to develop and implement a comprehensive unexploded ordnance (UXO) risk mitigation strategy for a development project on a former RAF site in Scotland.

Read more

UXO risk mitigation strategy for UK constructor

SafeLane Global was the principal site contractor for a leading UK constructor on a former MoD site.

Read more

Non-intrusive survey for a solar energy farm UK

Non-intrusive survey of a former Royal Air Force station that was being developed as a utility scale solar energy farm.

Read more

Intrusive survey for airdropped bombs UK

The company was contracted to provide UXO risk mitigation services for infrastructure development at a sewage treatment works in UK.

Read more

Offshore risk assessment for a submarine cable route

SafeLane Global's marine experts completed a detailed risk assessment for a 714km submarine cable route between England and Norway.

Read more